Galvanized Powder Coating Scaffold System h Frame Scaffolding For Construction
Galvanized Powder Coating Scaffold System h Frame Scaffolding For Construction
Galvanized Powder Coating Scaffold System h Frame Scaffolding For Construction
Galvanized Powder Coating Scaffold System h Frame Scaffolding For Construction
Galvanized Powder Coating Scaffold System h Frame Scaffolding For Construction
Galvanized Powder Coating Scaffold System h Frame Scaffolding For Construction
Price
US $5.2-5.6
MOQ
1000 piece

Review

Description

Galvanized Powder Coating Scaffold System h Frame Scaffolding For Construction


Product Description:

Galvanized Powder Coating Scaffold System h Frame Scaffolding 

1. Variety: Walk through type & Ladder type

2. Type: H frame scaffolding system & A frame scaffolding

3. Diameter48.3mm

4. Thickness of the tube: 3mm 3.2mm 3.25mm 3.5mm 4mm or customize

5. Color: silver, red, blue, yellow, green or customize

6. Main components: frame, catwalk, joint pin, cross brace, base jack, u-head jack and caster,lock pin,etc.

7. Surface treatment: HDG/Pre-Galvanized/Power Coated.

8. Standard: EN74 BS1139 AS1576 AS 3610

9. Certificate: ISO 9001-2000/ISO9001:2008 approved.

Main product:
Company information:

Who We are?

(1) China Top 500 Enterprises Industry Leading Brands 
(2) 15 years experience in manufacturing and exporting steel products since 2000.
(3) For 10 Consecutive Years of The First Production and Sales

What We own?

8000 employees.
59 ERW steel pipe production lines

36 hot-dipped galvanized steel pipe production lines

24 square and rectangular steel pipe production lines 

18 SSAW steel pipe production lines
16 steel-plastic complex steel pipe production lines

9 hot-dipped galvanized square and rectangular steel pipe production lines

5 Seamless steel pipe production lines
3 national accredited laboratory 
1 Tianjin government accredited business technology center

Exibition:
Certification &Testing:

 FAQ:

Q:Are you trading company or manufacture?

A:Factory.we are YOUFA group with 3 production area in china

Q:Can i have a trial only for several tons?

A:Of course!we can ship the cargo for you with LCL service

Q:How long is your delivery time?

AGenerally it is 3-5days if goods are in stock,or it is 30 days if the goods are not in stock.

Q:What is your terms?

A:T/T,L/C